About Edgar Tolentino:
Working in Singapore for more than 10 years as a Mechanical & Electrical Draftsman uisng Microstation and autocad.
Experience
Mechanical & Electrical Draftsman cum Coordinator
GS Engineering & Construction (Singapore)
01 July 2016 to Present
Software Used: Microstation V8i and Navisworks
Project: Contract T301 East Coast Integrated Depot and Reception Tunnels
• Prepare coordination drawings (CSD & SEM) in the construction of 4-IN-1 Rail and Bus Depot (T301)
• Coordinate/Liaise with SWC on the general arrangements of all M&E services.
• Prepare drawings and sketches to support construction work as required.
• Prepare As-Built drawings submissions.
• Perform additional assignments and responsibilities as assumed or requested.
• Prepare request for SWC site inspection/clearance for concrete casting.
Mechanical & Electrical Draftsman cum Coordinator
GS Engineering & Construction (Singapore)
10 Nov. 2011 to 30 June 2016
Software Used: Microstation V8i and AutoCad
Project: Contract C925 Tampines East Station
• Prepare coordination drawings (CSD & SEM) in the construction of Tampines East Station (C925A)
• Coordinate/Liaise with SWC on the general arrangements of all M&E services.
• Prepare drawings and sketches to support construction work as required.
• Prepare As-Built drawings submissions.
• Perform additional assignments and responsibilities as assumed or requested.
Mechanical & Electrical Draftsman
Sembawang Engineers & Constructors (Singapore)
01 Dec. 2010 to 09 Nov. 2011
Software Used: Microstation V8 & AutoCAD
Project: Contract C856 Construction of West Coast, Pasir Panjang, Labrador, Telok Blangah and Harbour front station
• Coordinates the preparation of shop drawings (CSD & SEM) for tunnel & station.
• Prepares M&E coordination drawings.
• Attend project coordination meeting with consultants as requested or as required.
• Prepares drawings and sketches to support construction work as required.
• Prepares As-Built drawings submissions.
• Perform additional assignments and responsibilities as assumed or requested.
Electrical Draftsman
Powen Electrical Engineering Pte Ltd (Singapore)
15 Apr. 2010 to 31 Nov. 2010
Software Used: Microstation V8 & AutoCAD
• Coordinates the preparation of electrical drawings such as power layout, lighting layout, lightning layout and other electrical drawings
• Prepares mechanical drawing such as ACMV layout, sanitary & plumbing layout, fire protection layout and other mechanical drawings
• Prepares the CSD & SEM drawing.
• Attend project coordination meeting with consultants as requested or as required.
• Prepares drawings and sketches to support construction work as required.
• Prepares As-Built drawings submissions.
• Perform additional assignments and responsibilities as assumed or requested.
M&E Designer/ Senior Drafter
HITECH Engineering Management Consultant (Singapore)
29 July 2009 to 14 Apr. 2010
Software Used: AutoCAD & DIALux
• Prepares single line diagram, lighting layout, power layout and other electrical drawing.
• Prepare & design drawing for sprinkler and smoke detector layout.
• Prepare & design potable water and sanitary layout & schematic diagram.
• Perform additional assignments and responsibilities as assumed or requested.
Cadd Operator (Electrical, Mechanical & Architectural)
Al-Hejailan Consultants-Design & Management (Saudi Arabia)
February 2007 to February 2009
Position: Software Used: Microstation V8 & AutoCAD
• Prepares single line diagram, panel schedule, lighting layout, power layout, grounding layout, site area lighting.
• Conduct survey and design of overhead power line(13.8kv) and cathodic protection for oil & gas wells in various areas.
• Prepares drawing for overhead power line routing.
• Prepares architectural drawings (plan, section & elevation).
• Prepares mechanical drawing (fire protection, hvac & plumbing layout).
• Perform additional assignments and responsibilities as assumed or requested.
Electrical CAD Engineer (Electrical, Mechanical & Architectural)
Aceplp.com Pte Ltd (Singapore)
November 2004 to August 2006
Software Used: Microstation V8 & AutoCAD
• Prepares single line diagram, panel schedule, lighting and power layout.
• Planning cable raceway/ conduit routing to field panels and determine the size and elevation of cable tray.
• Prepares 2D drawings layout by extracting from 3D model.
• Prepares section, elevation and detail of cable tray routing.
• Perform additional assignments and responsibilities as assumed or requested.
Education
Bachelor of Science in Electrical Engineering
Graduated – October 2002
Adamson University, Manila, Philippines
Passed the Registered Electrical Engineering Licensure Examination September 2003
Professionals in the same Construction / Facilities sector as Edgar Tolentino
Professionals from different sectors near Ang Mo Kio New Town
Other users who are called Edgar
Jobs near Ang Mo Kio New Town
-
Head of Customer Success
Found in: Talent SG C2 - 3 weeks ago
HSBC Singapur, Singapore Permanent - Full time $80,000 - $120,000 per yearSome careers have more impact than others. · If you're looking for a career where you can make a real impression, join HSBC and discover how valued you'll be. Whether you want a career that could take you to the top, or simply take you in an exciting new direction, HSBC offers o ...
-
Senior Sales Support Executive
Found in: Talent SG 2A C2 - 3 weeks ago
Mount Elizabeth Hospital Singapore Full time $40,000 - $80,000 per yearThe Role · Costing: · 1.Support preparation of customize costing and engagement with internal stakeholders. · 2.Support the preparation of key tender costing and performing data analysis for pricing strategy. · 3.Tracking of costing progress · 4.Costing stage ends once the releva ...
-
Full Stack Developer
Found in: Talent SG 2A C2 - 3 weeks ago
Singapore Technologies Engineering Singapore $60,000 - $120,000 per yearResponsibilities · • Software maintenance of the existing software modules · • Optimization of the application for maximum speed and scalability · • Software design and development of the new enhancements · • Develop and maintain software application using ESRI products · • D ...