
Thurein Ko Ko
Engineering / Architecture
About Thurein Ko Ko:
I'm Thurein Ko Ko. I was graduated in 2016 specified with GEOLOGY. I would like to apply the job with GEOTECHNICAL ENGINEER. I consider myself to be hard working comitted and honest.
Experience
My professional working experience in Singapore with GEOTECHNICAL ENGINEER was about over 6years already.
- TERM AND CONTRACT NO.44 FOR SITE INVESTION WORKS FOR A PERIOD OF 30 MONTHS
CLIENT : HOUSING AND DEVELOPMENT BOARD
(Sep 2022~Present)
Soil Investigation, Instruments installation, Monitoring data, Borelog, AGS and Factual Report, Cadastral drawing, Field permeability & Reports, Preparation of Laboratory tests Proposal
- PUB CONSTRUCTION OF LINK SEWERS FOR THE DTSS PHASE 2 PROJECT (MK-TUNNEL) MH-4A : SAMWOH – DAESUNG JV
(July 2022~Oct 2022)
: Field Permeability Tests and Reports
- RECLAMATIONFOR TUAS TERMINAL PHASE 1
MAIN CONTRACTOR : DIAP – DAELIM JV
(2017~Oct 2022 Project completion)
: Soil Investigation, Instruments installation, Monitoring data, Borelog, AGS and Factual Report
- Contract N106 : Design and Construction of North-South Cooridor(Tunnel) Between Novena Rise and Toa Payoh Rise
MAIN CONTRACTOR : SAMSUNG C&T
: Soil Investigation, Borelog and AGS
- CONTRACT T307 : Construction Of Marine Parade Station and Tunnels for Thomson-East Coast Line
MAIN CONTRACTOR : SAMSUNG C&T
: Soil Investigation, Instrument installation, Borelog and AGS
- PROPOSED RECLAMATION AT TUAS FINGER ONE
MAIN CONTRACTOR : HPBV JV (HYUNDAI,PENTA OCEAN,BOSKALIS,VAN OORD)
: Soil Investigation, Borelog, AGS and Factual Report
- CONTRACT N113 : CONSTRUCTION OF THE NORTH-SOUTH CORRIDOR
MAIN CONTRACTOR : HYUNDAI ENGINEERING
: Soil Investigation and Borelog
- 34 STOREY OFFICE BUILDING AT LABRADOR VILLA ROAD (PROJECT : TT-BC1)
MAIN CONTRACTOR : HYUNDAI ENGINEERING
: Soil Investigation, Borelog, AGS, Cross section and Factual Reports
- SOIL INVESTIGATION AND SURVEY WORKS AT TUAS WESTERN SINGAPORE
CONSULTANTS : JTC
: Soil Investigation, Borelog and AGS
- CONTRACT : T316 CONSTRUCTION OF UNDERGROUND INFRASTRUCTURES : UIB
: Sonic coring (Soil Investigation), Borelog and Factual Report
- CONTRACT : N101 CONSTRUCTION OF THE NORTH-SOUTH CORRIDOR
: Sonic coring (Soil Investigation), Borelog and Factual Report
Education
Bachelor of Science (Geology) (Qualifying)
2012 December ~ 2016 September
WEST YANGON UNIVERSITY , YANGON (MYANMAR)
Diploma in Construction Engineering
2022 October ~ Present
Building and Construction Authority, BCA Academy (SINGAPORE)
Related Qualification
- Geotechnical Engineering Course
(MYANMAR GEOSCIENCES SOCIETY)
- Supervise Construction Work for WSH
(CONCORD ASSOCIATES PTE LTD)
- Registered Earthworks Supervisor
(SP POWERASSETS LTD)
- Project Safety Management
(SP POWERASSETS LTD)
- Manage Workplace Safety And Health
(A-TECH HUB PTE LTD)
- Site Investigation Supervisors
(BCA Academy)
- Certificate in Construction Technology
(BCA Academy)
Professionals in the same Engineering / Architecture sector as Thurein Ko Ko
Professionals from different sectors near Singapore
Jobs near Singapore
-
Engineer | Geotechnics
1 month ago
Arup SingaporeWe are seeking an experienced Geotechnics Engineer to join our team in Asia Pacific Region. As a Geotechnics Engineer at Arup you will provide sound geotechnical consulting engineering services. · ...
-
Senior / Geotechnical Engineer
6 days ago
CPG Corporation Pte Ltd Jurong WestWe are looking for a senior geotechnical engineer with minimum of three years of experience in civil/geotechnical engineering design codes regulations requirements Eurocodes proficient in geotechnical design software such as PLAXIS among others strong interpersonal communication ...
-
Geotechnical Engineer
1 month ago
Ariff SingaporeA geotechnical engineer is responsible for undertaking detailed design in the geotechnical field for different types of projects. · ...