beBee background
Professionals
>
Jurong West New Town
Aung Linn

Aung Linn

M&E Installation residential and marine sector.

Engineering / Architecture

Jurong West New Town

Social


About Aung Linn:

Electrical Engineer with over 10 years of experience in diverse projects across the oil & gas marine industry (Singapore, Indonesia) and commercial, residential high-rise and factory construction sectors (Myanmar). Holds both a Bachelor's degree and a diploma in engineering. Possesses strong expertise in electrical system installation (LV, MV), M&E system, site management, and engineering value optimization. Eager to contribute good quality outcomes in working organization.

Experience

New Pyae Sone Group Co.,Ltd.   (Myanmar)                                          Sept 2020 – Until Now

Duties & Responsibilities

  • Make report to HPBC (High-Rise and Public Building Projects Committee).
  • Inspect as representative and registered of HPBC all electrical installation (high/low voltage. ELV, lightning, earthing system) as per approved drawing and HPBC Guide Line.
  • Monitor and coordinate with main construction company to meet Guide Line, time schedule.
  • Conduct with test & commissioning and internal QC team of construction for finishing systems, collect government authority inspection approval documents to make report.
  • Keep in discuss for progress, drawing updating, material specification and installation status.
  • Provided technical support and assist contractors to comply with installation guide line.

KTK Electrical Engineering Co.,Ltd.  (Myanmar)                               Mar 2014 – Aug 2020

Duties & Responsibilities

  • Managed assembling section of panel production and cooperate with other sections of design, procurement, control wiring, painting, machining for production process. 
  • Managed installation and servicing for customer panels and devices on site.
  • Made operation & maintenance manual documents for product panels.
  • Carried out FAT, SAT testing with client, government supply team, gen set team.
  • Coordinated with production process and installation teams for customer onsite requirements.
  • Served as the main point of engineering technical challenge and product quality for customer.

EDARAN ASIA PTE., LTD.  (Singapore)                                                May 2010 – Feb 2014

Duties & Responsibilities

  • Cooperated with design & draft section to make new drawings, modify and update drawings.
  • Installed compulsory systems for accommodation crane barge (living rooms, crane, helideck, firefighting (including sprinkler, CO2, foam), gen-set, AHU, ballast tank, sewage, etc.
  • Installed pressurized fan, detectors (gas, smoke, heat), pressure differential meter, air pressure control damper, beacon alarm, PLC control panel, etc, for pressurize container.
  • Managed labors, materials and time controlling of unnecessary wastes for a specific project.
  • Discussed with site supervisors to accept client inspection and to complete at the target date.
  • Conducted with testing & commissioning team to be acceptable to marine class requirements.

OCEAN MARINE & OFFSHORE PTE.,LTD.  (Singapore)                  May 2007 – April 2010

Duties & Responsibilities

  • Supervised installation of mechanical & electrical instruments at FPSO ship, supplier ship, semi-submersible rig construction projects.
  • Prepared detailed schedule of works and got approval of Senior Engineer for further action. 
  • Attended site internal meetings to discuss the problems that related status of the projects.
  • Learned and studied the working process in site conditions.
  • Worked within project deadlines and prioritizing task from time to time as scheduled.
  • Checked the electrical devices and fixtures (cable laying and termination, panel, DB board, smoke detector, heat detector, speaker, switch, lighting, etc) installation finishing works.
  • Reported to Senior Engineer finishing and maintained checking day-to-day installations.

Peace Myanmar Electric Co., Ltd.  (Myanmar)                            July 2004 – Jan 2007

Duties & Responsibilities

  • Installed cable ladder & tray, wiring, air-con, fixtures, etc. for resident and generator, panel, motor starter etc. for industry.
  • Discussed with supervisor, leader for progress, drawing, materials status to meet schedule.
  • Supervised to the general workers in all process of manufacturing.
  • Cooperated for drawing making, material purchasing and solving engineering problems.
  • Checked all finishing conditions and tested running operation.                                                 

 

Education

Bachelor of Engineering, Industrial Engineering

Yangon Technological University

March 2002

 

Associate of Government Technical Institute, Electrical Power Engineering

Government Technical Institute Hinthada

Dec 1997

Professionals in the same Engineering / Architecture sector as Aung Linn

Professionals from different sectors near Jurong West New Town

Other users who are called Aung

Jobs near Jurong West New Town

  • Work in company

    Project Engineer

    Collars Consultancy Pte. Ltd.

    A Project Engineer leads projects from conceptual design through to final handover. · ...

    West Region

    3 weeks ago

  • Work in company

    Senior Carpenter 木匠

    Manpower Advisors

    木匠 · Carpenter (中工/头手) · Location: Ubi, Kaki Bukit & Loyang Area  · Construction Sector,  SGD 2,200 - SGD 3,500 · Working Hours/ Days : 9am - 6PM, 6 Days (Sunday Off) · Job Description: · Involving in the design, cutting, and building of furniture using different types of wood. ...

    Singapore, North-East

    3 days ago

  • Work in company

    Air Con Technician

    Manpower Advisors

    Position: Aircon Technician (For Construction Work Permit Holders) · Working hours: 9 am - 6:30 pm · Working days: Monday - Saturday · Daily Basic Salary: $ · Housing provided · Roles & Responsibilities: · -Assembling, installing and testing aircon systems for residential & comm ...

    Singapore, East

    1 week ago