Phone Min Kyaw (B.E Civil)
Site Engineer cum Drafter

 

, 8454 1422, 10-126, Blk 212 Choa Chu Kang Central, Singapore 680212
Milestone

.
TurnKey Project “>
construction projects for which the developer undertakes the

. *« .
ol Site Fi nishing whole responsibility from design to completion so that the

building is available to the buyer in a ready-to-use condition

Brickwork, masonry, Plumbing,
Painting, Architecturing, Workshops

. EN
Site Concrete
Scaffoldi ng Ran Cement Concrete, Pouring height,
Sl strength , Ratio, Vibrators
Shuttering, formwork, plumbing, Bar Bending Schedule <b

leveling

Main bars, Distribution bars, Raft, Chair, Crankbars / Bent-
© © © up Bars, Concrete Cover, Stirrups, Ties Bend, Overlaps, steel

wv» Waterproofing Ringe
Bitumen coat, 3.5mm membraneapply by fire Excavation E
LJ

Demarcation, Dimensions, Excavation,
State Academy Project

Multi Story Building (3 No.s)
Site Engineer cum Drafter

 

(Glos - 2.766 Billions (MMK)
Duration WA GENS
Location - [Q25W+W23, Naypyidaw]

This project includes 4 Storeyed RCC building , 2x3
Storeyed RCC buildings, Road construction and
IT ole eT ole 1ed

 

Master Plan Preparation Completion of Project (Ready to use condition)

 

Assembly Hall Supervision Rebar Installation Concreting Work Supervision JRC ate Rea Road Pavement
Silja gyal MINSRYS Supervision
Negapali Win Hotel Project

3 Storeyed RCC Building (2 No.s)
NTCDA Taguig DIE 11a

(Glos - 3.4 Billions (MMK)
Duration - 18 Months
Location - [No 203, Zi Phyu Kone]

This project includes 10 Units 3 Storeyed and 4 Units 3
Storeyed RCC Construction.

 

Completion —Access to Serve During Construction

|

\

*

\

p
©
=
2
iL”
EA

Pos

Master Plan Preparation Completion of Project- Access to Service

 

Basement Rebar and Formwork
Installation Supervision

 

During Construction

  

 

Coordination Meeting with
Su-constructors
Mawrawady Condo Project

16 Storeyed RCC Building
Site Engineer cum Drafter

Glo} - 16.8 Billions (MMK)
Duration SRR GETS
Location - [135 Pyay Rd, Yangon]

This project includes 4 Storeyed Basement and 4 Units 12
Storeyed Construction.

     

: — TE

Master Plan Preparation empl Oil THe fH DIST A Qe eg Tua le)0
(Ready to use condition)

 
  
  
 

  

ft |

TTT rp
ET === :
Ht CET ay
RT ar

BH E

IS L 1]

 

Rebar Installation and MEP SP RO Te CT Lee
Work

MEP Installation Supervision Fire Pipping Work Completion
Byamaso Mini-condo Project

   

A pr EE Aix
Cost - 1.8 Billions (MMK) an—s WM iE
Duration - 2 Years
Location - [V53H+J9P Yangon]

This project includes 2 Units 8 Storeyed RCC
@fe) iN igileisle) ol

 

Ge

» 4 _ a ENN wl J
Completion of Project- Model BITS TIA @e Rs Ita aTe30
(Ready to use condition)

 

 

Slab Concreting Work
Supervision

Roof Top Rebar Installation Emergency Stair Finishing of Concreting Work
3 Storeyed RCC Building
NTCDA Taguig DIE 11a

(Glos - 300 Millions (MMK)
Duration - 13 Months
Location - [V4FG+P3C Yangon]

This project includes 4 Units 3 Storeyed RCC
@fe) iN igileisle) ol

 

Master Plan Preparation Completion of Project- Model Lift Rebar Installation

 

ae

Rh epee
2A NN ; FE) - 7

     

During Construction Slab Concreting Work Infrastructure Construction
Supervision

Waterproofing Work
Cost

Duration

Location

This project includes 1 Storeyed Basement and 3 Units 3
Storeyed RCC Construction.

 

BITS TIA Ge Rs Ita a Te) Slab Rebare and MEP Waterproofing at Expension Joint

Shwegantawin Extension Residential Project

4 Storeyed RCC Building
Site Engineer cum Drafter Mr]

   
 
  
  
  

- 150 Millions (MMK)

- 10 Months

- [R537+XGP Yangon]

    

  

x ~\
1 TTT COME

Tr)

iy

: 3 a MEP Installation Supervision
Installation Supervision Supervision
Melika Residential Project

  
  
 
 
   
 

4 Storeyed RCC Building
QA QC Engineer cum Drafter
(Glos - 350 Millions (MMK)
Duration - 1 Year
Location - [RSRX+F5P Yangon]

This project includes 4 Units 3 Storeyed RCC
Construction.

 
 
 

is =X
Ne

 

Slab Rebar and MEP Installation Curing Process Applying

ion — i During Construction hr!
Completion —Access to Live 8 Sa
Quarry Inspection For Zaungtu Dam Stabilization

Maintain Dam Stabilization
Site Inspector

Myanmar Geological Map -2014

Cost - NA (MMK)

Duration -NA ACER
. Quarry & Borrow Soils

Location - [Q53X+XVR, REE)

This project includes Meeting & Discussion before Quarry
Site Inspection, taking the inspection to identify the Raw
Materials.

   

Ta
= TH
ER Sa

LN PA OPI he
< PUTA

de age RET

Inspection on Dam failure

 

 

Checking Raw Materials Taking Samples to Identify Checking Raw Materials Photo with Government Officer
Terrazo Floor Supervision At Pagoda

Terrazo Floor Construction on Bagoda Platform

Site Engineer (QA QC)
Cost - 550 Millions (MMK)
Duration - 3 Months
Location - [PRHJ+55H, lH

This project includes cleaning of failure on floor, making
of alternation area to apply, to make sure step by step,
making design as per client instruction. rT

floor area LC

  

pao!

24 Re
IY =
7d 1

TH a E py ‘i
CAs 17

   

Making Archi shape with Making Archi shape and divide the Taking Abrasion with Gliter Step Completion Condition
plastic plate pattern with glass plate SAS Access to Walk on
Soil Test Inspection At Ngapali Beach

Soil Test Procedure For the Construction of Resort

 
 
   
  
 
  
   
   
   

Site Engineer (QA QC)
Glo} - 250 Millions (MMK)
Duration - 2 Months
Location - [78PC+4R2 Thabyugyaing]

This project includes counting of SPT to get soil sample
correctly, maintain of soil samples until reach laboratory,
reporting of geo-situation to Profession Engineer and Director
to identify whether or not continuous.

  

EA PUR Ds = ES RY ENE Be wo NEE SENAY
Soil Test Operation on Hill
beside of Beach

Soil Test Operation on Hill Taking Samples to Identify Making Record al Report to PE Tube Well Operation at Yangon
beside of Beach and Director
Retrofitting and decoration of Condominium/ House

Retrofitting and decoration
Site Engineer (QA QC) cum Drafter

 
  
  
  
 
  
  
  
   

(Glos - 600 Millions (MMK)
Duration - 5 Months
Location - [VACR+4H3 Yangon]

This project includes design and construction of fencing ,
RCC retaining wall, flower boxes, pavement and store.

 

Master Plan Preparation
for Construction

Spiral Stair

QT) ET Re LTT During Construction Fencing Construction IE Tl Teg SCRA
Flower steps
Steel Structure, Polycarbonate Roof Project

Steel Structure Building
Site Engineer cum Drafter

  
  
  
 
  
  
 
 

(Qo - 25 Millions (MMK)

Duration - 4 Months

Location - [VAFG+P3C Yangon][R686+C2R Yangon]
[VACR+4H3 Yangon]

This project includes steel structure construction and polycarbonate
roof installation according to Singapore Standard.

Car ZION Cantilever Roof House Entrance Verandah
Phone Min Kyaw
(B.E Civil)
phoneminkyaw.sg@gmail.com

8454 1422

10-126, Blk 212 Choa Chu Kang
Central, Singapore 680212

=
vatse
Portfolio & Services
Comments

You may be interested in these jobs

  • KAROOOOO MANAGEMENT COMPANY PTE. LTD.

    QA Tester

    Found in: Talent SG 2A C2 - 6 days ago


    KAROOOOO MANAGEMENT COMPANY PTE. LTD. Singapore

    Roles & Responsibilities · You want to · Define the test strategy for projects · Design and execute test cases to ensure all applications meet the minimum company standard · Create bug reports and follow through to resolution · Identify severity of system issues and communicate a ...

  • Nityo Infotech

    Functional Business Analyst

    Found in: Talent SG C2 - 5 days ago


    Nityo Infotech Singapur, Singapore

    Key Responsibilities (Internal Reference) · •Business requirements (jointly with BU Specialist) · •Functional requirements (incl. input/output, data, security) · •Non-functional requirements Job Responsibility · •Requirements Analysis & ElicitationoCollaborate with BU Specialist ...

  • LUMEN CAPITAL INVESTORS PTE. LTD.

    Head of Compliance

    Found in: Talent SG 2A C2 - 5 days ago


    LUMEN CAPITAL INVESTORS PTE. LTD. Singapore

    BETA · You can view this job inLUMEN CAPITAL INVESTORS PTE. LTD.Head of Compliance · MCF · SINGAPORE LAND TOWER, 50 RAFFLES PLACE 048623PermanentSenior Management5 years expBanking and Finance$8,000 · to $12,000 · Monthly · 16 applications · Posted 03 Apr 2024 · Closing on 03 Ma ...